ÖZIŞIK İnşaat ve Enerji A.Ş.- İNTEKAR Yapı Tur.Elkt.İnş.San. ve Tic.Ltd.Şti.-İNŞAAT Elektrik ve Tic.Ltd.Şti. İş Ortaklığı
Contract Scope
Sanliurfa Harran of the town about 90 miles east of Mardin main channel Mileage: 140 +000- Km: 198 +750 left between gross 20 867 hectares of agricultural land sulanması.çap Ø 110 mm - Ø 710 mm, ranging 300.00 km HDPE pipe diameter Ø 800 mm - 2400 mm Ø 110.00 km of GRP pipes ranging.
Height From The Basement 91.00 m ,Length 570.86 m, Installed Capacity 4 x 40 MW, Generator Capacity 44 444KVA, Quantity of Excavation 10 600 000 m3, Quantity of Filling 2 800 000 m3, Quantity of Concrete 338 000 m3, Quantity of Injection 27 000 m
General Directorate of State Hydraulic Works and Civil Works Department
Contractor
ÖZIŞIK İnşaat ve Enerji A.Ş. And İNTEKAR Yapı Tur.Elkt.İnş.San. ve Tic.Ltd.Ştiç
Contract Scope
6788,40 ha agricultural area of Afsin, Elbistan and Goksun towns of Kahramanmaraş city shall be irrigated by pipe type water irrigation system. 213854,77 m PE100 pipe and 61257,15 m CTP pipe with various size and pressure rating shall be used.
Installed Capacity 3.5MW,Head 116 m,Regulator Transfer Channel (1554 m),Forebay Pool,Penstock Pipe 340 m and The Power Plant Equipped With 2 Lateral Axis Francis Type Turbines.
Installed Capacity 10.5 MW,Head 270 m,Regulator Transfer Tunnel(1538 m),Penstock Pipe 406 m and The Power Plant Equipped With 2 Vertical Axis Pelton Type Turbines.
Height From The Basement 91.00 m ,Length 570.86 m, Installed Capacity 4 x 40 MW,Quantity of Excavation 10 600 000 m3, Quantity of Filling 2 800 000 m3, Quantity of Concrete 338 000 m3, Quantity of Injection 27 000 m
Dam Type Earthfill With Clay Core, Height From The Basement 86m, Length 416m, Total Reservoir Capacity 31 140 000 m3, Quantity of Excavation 7 694 000 m3, Quantity of Backfill 5 273 000 m3, Quantity of Concrete, Tunel Ø 5000mm - 496m, Irragated Area 3 348 ha
furniture.
Irragated Area 5 547 ha, Quantity of Excavation 3 450 000 m3, Quantity of Backfill 1 800 000 m3, Quantity of Concrete 101 000 m3, Quantity of Formwork 120 000 m2, Reinforcing Steel 640 ton, Steel Construction 474 ton, Building Construction 1720 m2, Concrete Canal 180 km, Drainage Canal 146 km
Infrastructure Works, 1 Pumping Plants, 115 Bridges, 127 Out Falls, 22 Flooded Passages, 200 Check Structures, 78 Fall Structures, 710 Offtake Regulator, 115 Culverts
Irragated Area 9 036 ha, Quantity of Excavation 12 500 000 m3, Quantity of Backfill 4 900 000 m3, Quantity of Concrete 255 000 m3, Quantity of Formwork 280 000 m2, Reinforcing Steel 2 900 ton, Steel Construction 900 ton, Building Construction 6 000 m3, Concrete Canal 303 km, Drainage Canal 305 km
Irragated Area 540 ha., Height From The Basement 26 m, Quantity of Excavation 800 000 m3, Quantity of Backfill 580 000 m3, Frame Length 360 m, Quantity of Concrete 16 000 m3, Quantity of Formwork 14 000 m2, Reinforcing Steel 51 ton, Steel Construction 27 ton, Concrete Canal 29 km, Drainage Canal 305 km
Power of Generator 1500 KW, B 225 Concrete 8062 m3, Butterfly Valve Ø 2200 mm, Slide Valve 1700 x 1700 mm, Conical Valve Ø 1100 mm, Overhead Crane 5-30 Ton, 2 Pieces, Water Treatment 1 m3/h Capacity, Water Discharge System 50 m3/h Capacity
Irragated Area 15 620 ha., Quantity of Excavation) 9 241 000 m3, Quantity of Backfill 3 483 000 m3, Quantity of Concrete 155 000 m3, Quantity of Formwork 183 000 m2, Reinforcing Steel 504 ton, Steel Construction 245 ton, Building Construction 400 m2, Concrete Canal 194 km, Drainage Canal 317 km
Length of Tunnel 2820 m., Irragated Area 3 262 ha., Quantity of Excavation 145 000 m3, Quantity of Concrete 20 000 m3, Quantity of Formwork 30 000 m2, Reinforcing Steel 65 ton, Steel Construction 131 ton, Syphon Length 600 m3, Main Channel Length 2 700 km
Sea-fill 6 235 000 ton, Quantity of sub – base 610 000 ton, Quantity of base 940 000 ton, Shoulder 125 000 ton, Bituminous Base 1 610 000 m2, Binder 1 550 000 m2, Wearing Course 1 540 000 m2, Surface Coating 300 000 m2, Quantity of Excavation 5 075 000 m3, Quantity of Concrete 165 000 m3, Quantity of Paving Stone 240 000 m2, Reinforcing Steel 6 500 ton
Total Length 24,576 km, Asphaltic Concrete 350,000 ton, Quantity of Excavation 3,200,000 m3, Sea-fill 3,100,000 ton, Quantity of Concrete 150,000 ton, Reinforcing Steel 8,200 ton
Total Length 61.536 km, Quantity of Excavation 4 500 000 m3, Sea-fill 7 000 000 ton,Quantity of Concrete 350 000 ton, Reinforcing Steel 18 200 ton, Pile 50 km, Quantity of sub – base 700 000 ton, Quantity of base 900 000 ton, Bituminous Base 500 000 ton, Binder 300 000 ton, Wearing Course 220 000 ton
Factory Closed Grounds 32 389 m2, Prefabricated Indoor Area 8 129 m2, Steel Cons. Indoor Area 24 260 m2, Quantity of Concrete 27 571 m3, Quantity of Formwork 36 817 m2, Reinforcing Steel 475 ton, Steel Construction 2 254 ton, Steel Truss Width 25 m, Height Of Building 15.30 m
B 300 Concrete 850 m3, B 225 Concrete 1 250 m3, Blast Valves 12 Pieces 62x62x115 cm, Blast Door 1 Pieces 110x225x25 cm, Air Condition Set 120 000 kcal/sa, Generator 225 KVA, Fire Alarm-Extinguisher Pyrotronic,